Project

General

Profile

Feature #1893

cleanup p2j_project_guide.html to cut it down to just a minimum getting started guide

Added by Greg Shah over 11 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Start date:
10/31/2012
Due date:
% Done:

100%

Estimated time:
12.00 h
billable:
No
vendor_id:
GCD

History

#1 Updated by Greg Shah over 11 years ago

  • Target version set to Milestone 2

Any useful content can be checked into a non-core BZR project. The majority of the content can come from the Dev Guide or the Runtime Installation, Configuration and Administration Guide. Keep it simple and really it should just be the minimum to:

1. install and build from source
2. convert a simple testcase
3. run the server with the result
4. run the swing chui client to access the server

Anything else?

#2 Updated by Greg Shah over 11 years ago

  • Target version changed from Milestone 2 to Milestone 18
  • Estimated time changed from 4.00 to 12.00

#3 Updated by Greg Shah over 10 years ago

I removed most of the unnecessary content after checking that the content was existing somewhere else (our books) in at least as good a condition.

What remains is a major update to the remaining content to be accurate and up to date.

#4 Updated by Greg Shah over 7 years ago

  • Target version changed from Milestone 18 to Revise Documentation and Training Materials

#5 Updated by Greg Shah about 7 years ago

  • Status changed from New to Closed
  • % Done changed from 0 to 100

Also available in: Atom PDF